So anyway, Dave pitched up back of nine with a load of sand and cement. First he built the outer walls and we mocked up the fireplace:
Next he set the fireplace and the combustion chamber floor:
All that stuff under the block is loose fill vermiculite insulation. After that was done we had lunch. After lunch we built up the front and the riser sleeve:
And that was all the blockwork done. Eight hours on the nail. I think I could have spent a week doing it by myself, easily, and it still wouldn't have been straight or level.